Quality Control

Six checks between your confirmed specification and the packed order — material, dimensions, shielding value, sealing and hardware, finish, and packing.

How We Work

Checked Against Your Specification, Not a Catalogue

Every order starts from a confirmed specification — opening sizes, lead equivalent, glazing, hardware and finish. The checks below are run against that document, so what is verified is what you actually asked for.

Specification first

The order is only released to production after the specification and drawings are confirmed with you in writing.

Checked at each stage

Material, dimensions and shielding value are checked as the work progresses, not only at the end, so a problem is caught before it is packed.

No dispatch until confirmed

Finished items are checked against the specification and the packing list before they are released for dispatch.

The Checks

Six Stages, Start to Finish

Each stage has a defined check and a defined output — either a record or a release to the next stage.

Incoming material verification
01

Incoming Material

Steel, lead, glass, gaskets and hardware are checked on arrival against the ordered grade, thickness and quantity. The material certificate for the batch is filed against the order.

Checked: grade, thickness, surface condition, quantity, batch documentation

Dimensional check
02

Dimensions

Sheet sizes and cut panels are measured against the cutting list; door leaves, frames and any cut-outs are measured against the opening schedule before assembly.

Checked: sheet and panel size, leaf and frame dimensions, glazing and hardware cut-outs, diagonal squareness

Lead equivalent check
03

Shielding Value

Lead thickness is verified against the lead equivalent requirement, and joints and overlaps in a shielded assembly are checked so the protection is continuous rather than only correct at the centre of each panel.

Checked: lead thickness, overlap width at joints, edge and corner coverage, glass-to-frame seating

Sealing and hardware check
04

Sealing & Hardware

For hermetic and cleanroom doors, the gasket line, frame contact and hardware are checked with the leaf in place, so the door closes onto a continuous seal and the hardware operates correctly.

Checked: gasket continuity and compression, leaf-to-frame contact, hinge and lock operation, vision panel seal, optional automation interface

Finish and appearance check
05

Finish & Appearance

Coating adhesion, colour and surface condition are checked on the finished item, including the areas that will be visible once installed. Edges and cut-outs on coated parts are inspected for exposed substrate.

Checked: colour against the confirmed colour sample, coating continuity, scratches and dents, coated edges and cut-outs

Packing and dispatch check
06

Packing & Dispatch

The packed order is checked against the packing list item by item, with attention to the parts that travel badly: glass, thin lead sheet, door leaves and loose hardware.

Checked: quantity against packing list, glass and sheet protection, corner and edge protection, leaf bracing, hardware packed and labelled, case marking

What Comes With the Order

Alongside the goods, an order is accompanied by the documents needed to receive it and to confirm it matches the specification. Which documents apply depends on the product, so the list is confirmed with the quotation.

  • Packing list with item-level quantities
  • Material certificate for the batch, where issued
  • Test reports applicable to the product, where held
  • Marked-up drawing or opening schedule for fabricated items
  • Packing and handling notes for glass and thin sheet
  • Installation notes for hermetic and cleanroom doors

When Something Is Wrong

Report it on arrival, with photographs and the item reference from the packing list. We will confirm the cause and agree the fix — replacement, rework or a corrected item on the next shipment — before the material is installed.

Add a Check to Your Order

Tell us what has to be verified and how, and we will confirm whether it can be built into the order before you commit.

Email