The columns that decide the door type

  • Four columns on a door schedule determine what the door actually is: the clear width, the wall build-up, the sealing requirement and the traffic it carries.
  • Clear width tells you single or double leaf.
  • Wall build-up tells you the frame.
  • Sealing decides whether it is a hermetic leaf or an ordinary one.
  • Traffic decides the hardware and whether the leaf needs impact protection.
  • Everything else on the schedule is a finish or a fitting.

The columns that are usually left blank

Wall build-up, frame finish and hardware are the three most commonly missing entries.

Each one stops a quotation: the frame cannot be made without the wall, the finish cannot be ordered without the colour, and the hardware cannot be priced without knowing whether the door is locked, held open or self-closing. A schedule with these three filled in can be quoted in a day. Without them, the quotation is either delayed or carries an assumption that has to be corrected later.

Image 1 — placeholder

Promptarchitect marking up a hospital door schedule drawing on a table, technical drawings and scale rule, documentary office photography

ShotA door schedule drawing being reviewed, with the clear width and wall build-up columns visible.

Product01.5 Steel Hospital Doors

Image 2 — placeholder

Promptclose-up of a steel door frame being fitted into a hospital wall opening, construction site, natural light, detailed industrial photography

ShotA purpose-made steel frame set into a wall opening, showing the build-up the frame has to suit.

Product01.1 Operating Room Sealed Doors

Reading it against the escape strategy

Before the schedule is fixed, check it against the escape strategy. A door on an escape route has to open in the direction of travel, and that decision changes the leaf, the frame and the hardware — sometimes the swing side of the whole corridor.

Doing this at schedule stage costs an hour of drawing review. Doing it after the doors are made costs a new leaf.